PJ-07 Technology S-curve analysis (logistic growth, technology substitution curve)
Fit a logistic curve to an adoption or performance series to estimate a ceiling and an inflection date, as a draft result.
What it does
Fits a slow, fast and saturating curve to adoption or performance. Artefact: a fitted curve with ceiling and inflection date.
When to use it
Use when you ask how far or how fast adoption or performance will grow and the series has passed its inflection point or a ceiling is known.
When it does not fit
It is fitted before the inflection point (the ceiling is then poorly determined), the metric changes meaning, or the technology is replaced instead of saturating.
Result format
The result is a fitted logistic curve for adoption or performance, showing the slow, fast and saturating phases. It states the ceiling and the inflection date.
Requirements on the material
| Property | Requirement type | Requirement |
|---|---|---|
| Structure | Applies in some cases | requires=structured; requires=semi-structured |
| Content type | Always applies | requires=time series |
| Unit of analysis | Always applies | requires=variable |
| Variable types | Raises a warning | prefers=ratio; prefers=counts or fractions |
| Time structure | Applies in some cases | requires=aggregate time series |
| Level of detail available | Always applies | requires=aggregate tables |
| Appraises source credibility | Applies in some cases | no |
Not restricted on: How the sample was chosen, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.
| Minimum material | Observations past the inflection point, or a credible ceiling supplied from outside the series. |
|---|---|
| Additional sources needed | none |
| Not for (rules) | none |
| Not for (text) | The curve is fitted before the inflection point so the ceiling is poorly determined, the metric changes meaning, or the technology is replaced instead of saturating. |
Choosing and ordering
| Kind of technique | Primary technique, runs in step 5.3 |
|---|---|
| Phase tag | analyse |
| Other phase tags | none |
| Kind of finding | trend |
| Question answered | what next; how much |
| Strongest statement it supports | predict, without claiming a cause |
| Needs as input |
|
| Makes as output |
|
| Must exist first | None |
| Loop target | return to analyse |
Library checks by stakes
Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: repeatable with fixed settings.
| Stakes | Check | Person involved | Counts as a different method |
|---|---|---|---|
| exploratory | input validation | none | no |
| decision-informing | input validation | none | no |
| decision-informing | held-out validation | none | no |
| decision-informing | sensitivity analysis | none | no |
| high-stakes | input validation | none | no |
| high-stakes | held-out validation | none | no |
| high-stakes | sensitivity analysis | none | no |
| high-stakes | second technique with different assumptions | none | conditional |
| high-stakes | leakage check | none | no |
| high-stakes | assumption and limitation statement | none | no |
Failure modes and limits
| Model suitability | model plus code |
|---|---|
| Typical model failure | Reports a ceiling from a fit made before the inflection point as if it were well determined. |
| Error sources | input data; statistical assumptions |
| Certainty limits | Certainty drops when the fit starts before the inflection point (imprecision), the ceiling is assumed (risk of bias), or the metric changes meaning (indirectness). |
Related techniques
- pairs with PJ-01 Trend extrapolation and time-series forecasting (exponential smoothing, autoregressive integrated moving average models, trend impact analysis): plain extrapolation gives a comparison when the ceiling is uncertain
- should follow PE-04 Data profiling and rule-based validation (data audit; data quality assessment; edit checks): a data quality report shows changes in how the metric is measured
Evidence and tag basis
Unconfirmed. No accuracy study was opened.
Tag basis: input profile inference; selection inference; sequencing inference; robustness inference. All tag values are inference unless a source is named.