Project forward
These techniques produce forecasts and ranges: extending a measured trend, using the outcomes of similar past cases as a base rate, collecting anonymous expert estimates over several rounds (Delphi), reading a prediction market price as a probability, and eliciting structured expert estimates. Each states the form of projection it gives.
25 techniques. Open one to see what it does, when it fits and what it needs from your material.
| ID | Technique | Purpose | Evidence status |
|---|---|---|---|
| PJ-01 | Trend extrapolation and time-series forecasting (exponential smoothing, autoregressive integrated moving average models, trend impact analysis) | Extend the measured history of one indicator with a stated functional form to give a central projection with prediction intervals, as a draft result. | Unconfirmed |
| PJ-02 | Reference class forecasting (outside view, base-rate forecasting) Also serves: Compare. | Replace a bottom-up estimate with the distribution of outcomes in similar completed cases, giving a base-rate distribution and the case position in it as a draft result. | Tested |
| PJ-03 | Forecasting tournaments and superforecasting practice | Produce dated probability estimates for resolvable questions, score them with Brier scores and improve them by updating and aggregation, leaving a scored probability record as a draft result. | Tested |
| PJ-04 | Delphi technique (real-time Delphi, mini-Delphi) | Collect anonymous expert estimates over two or more rounds with controlled feedback, giving the median and interquartile range for each round as a draft result. | Documented |
| PJ-05 | Prediction markets (information markets) | Read the price of a defined contract as a probability for an event, giving a price series and a liquidity-qualified probability as a draft result. | Tested |
| PJ-06 | Structured expert elicitation (IDEA protocol: investigate, discuss, estimate, aggregate) | Elicit numeric estimates and ranges from experts before and after discussion and aggregate them mathematically, giving aggregated estimates with intervals as a draft result. | Unconfirmed |
| PJ-07 | Technology S-curve analysis (logistic growth, technology substitution curve) | Fit a logistic curve to an adoption or performance series to estimate a ceiling and an inflection date, as a draft result. | Unconfirmed |
| PJ-08 | Bass diffusion model | Forecast the adoption path of a product or practice from external-influence and imitation parameters and a market potential, giving a cumulative adoption curve and peak timing as a draft result. | Documented |
| PJ-09 | Hype cycle (technology expectations curve) | Place a technology on a five-phase expectations curve with a years-to-mainstream band, giving a placement to compare with measured attention data as a draft result. | Tested |
| PJ-10 | Trajectory analysis (technological trajectories, envelope curves; term not standard) | Track a performance metric across product generations and extend the envelope of best performance, giving a trajectory chart and rate of improvement as a draft result. | Unconfirmed |
| PJ-11 | Agent-based modelling and Monte Carlo simulation (microsimulation) | Simulate agents or random draws many times to give an outcome distribution with tail probabilities and the inputs that account for the spread, as a draft result. | Unconfirmed |
| PJ-12 | Scenario planning (intuitive logics, Shell approach) | Build a small set of internally consistent plausible futures from critical uncertainties so that a strategy can be examined in each, giving named narrative scenarios as a draft result. | Tested |
| PJ-13 | Scenario matrix (two by two scenario axes, alternative futures analysis) | Cross the two most critical and uncertain forces to give four scenario quadrants with narratives and signposts, as a draft result. | Documented |
| PJ-14 | Alternative futures archetypes (Manoa school, four generic futures) | Apply a fixed set of generic futures to a topic to give a short image of the topic under each archetype, as a draft result. | Unconfirmed |
| PJ-15 | Futures wheel (implications wheel) | Map first, second and third-order consequences of one change in rings, giving a radial diagram of consequences as a draft result. | Unconfirmed |
| PJ-16 | Causal layered analysis | Examine a topic at four depths (litany, social and structural causes, worldview and myth) for the present and each alternative future, giving a four-row table as a draft result. | Documented |
| PJ-17 | Cross-impact analysis (cross-impact matrix) | Adjust the probability of each event in a set according to how every other event raises or lowers it, giving adjusted event probabilities and an influence matrix as a draft result. | Documented |
| PJ-18 | Backcasting | Fix a desired end state and work backwards to the steps and conditions that connect it to the present, giving a dated pathway as a draft result. | Documented |
| PJ-19 | Policy stress-testing | Run a policy or plan through defined adverse or alternative conditions, giving a table of performance by condition and the cheapest changes that remove failures as a draft comparison matrix. | Documented |
| PJ-20 | Wargaming and simulation exercises (policy gaming, tabletop exercise) | Have players take the roles of competing actors in a structured scenario, giving a record of decisions and surprises as a draft result. | Unconfirmed |
| PJ-21 | Robust decision making, adaptive pathways and info-gap analysis | Test many model runs or futures to find the conditions under which a strategy fails and design strategies that adapt, giving vulnerability scenarios and pathway maps with trigger points as a draft result. | Unconfirmed |
| PJ-22 | Technology roadmapping | Lay out how markets, products, technologies and resources are expected to evolve on a common time axis, giving a layered time chart with dependencies as a draft result. | Unconfirmed |
| PJ-23 | Horizon scanning (environmental scanning) | Search systematically for early signs of change in sources outside the topic usual field, giving a signal database with source, date and rating as a collected evidence base. | Documented |
| PJ-24 | Weak signal detection (early warning signs, wild cards) | Identify small ambiguous early indications that may precede a discontinuity, giving a watchlist with a strength rating over time as an appraised evidence base. | Unconfirmed |
| PJ-25 | Leading indicators and signposts (indicators of change, trigger points) | Select measurable quantities that change before an outcome of interest and set thresholds beforehand, giving a table of indicators with lead time, threshold, source, frequency and owner as a draft result. | Documented |