PJ-12 Scenario planning (intuitive logics, Shell approach)
Build a small set of internally consistent plausible futures from critical uncertainties so that a strategy can be examined in each, giving named narrative scenarios as a draft result.
What it does
Builds a small set, usually two to four, of internally consistent plausible futures from critical uncertainties so that a strategy can be examined in each. Artefact: named narrative scenarios; read as the conditions under which each option succeeds or fails, not as a probability ranking.
When to use it
Use when you need to test a strategy against several different plausible futures and no one forecast can be trusted.
When it does not fit
Scenarios differ only in degree (optimistic, base, pessimistic), probabilities are attached and one is treated as the forecast, or no decision is tested against them.
Result format
The result is a set of two to four named narrative scenarios, each built from the critical uncertainties and internally consistent. It states for each strategy option the conditions under which it succeeds or fails in each scenario, and does not rank the scenarios by probability.
Requirements on the material
| Property | Requirement type | Requirement |
|---|---|---|
| Unit of analysis | Always applies | requires=topic |
| Appraises source credibility | Applies in some cases | no |
Not restricted on: Structure, Content type, Variable types, Time structure, How the sample was chosen, Level of detail available, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.
| Minimum material | A focal question, a horizon and external drivers ranked by impact and uncertainty; usually two to four scenarios. |
|---|---|
| Additional sources needed | none |
| Not for (rules) | none |
| Not for (text) | Scenarios differ only in degree (optimistic, base, pessimistic), probabilities are attached and one is treated as the forecast, or no decision is tested against them. |
Choosing and ordering
| Kind of technique | Primary technique, runs in step 5.3 |
|---|---|
| Phase tag | analyse |
| Other phase tags | none |
| Kind of finding | risk; option ranking |
| Question answered | what next; which option |
| Strongest statement it supports | describe |
| Needs as input |
|
| Makes as output |
|
| Must exist first | None |
| Loop target | return to frame |
Library checks by stakes
Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: judgement dependent.
| Stakes | Check | Person involved | Counts as a different method |
|---|---|---|---|
| exploratory | assumption and limitation statement | none | no |
| decision-informing | assumption and limitation statement | none | no |
| decision-informing | source-span citation | none | no |
| decision-informing | expert review | needed; left out below high stakes | no |
| high-stakes | assumption and limitation statement | none | no |
| high-stakes | source-span citation | none | no |
| high-stakes | expert review | needed | no |
| high-stakes | independent review | needed | no |
| high-stakes | provenance log | none | no |
Failure modes and limits
| Model suitability | human judgement required |
|---|---|
| Typical model failure | Writes optimistic, base and pessimistic variants of one trend and attaches probabilities to them. |
| Error sources | expert opinion; source selection; language model |
| Certainty limits | Certainty about any one scenario is not defined; confidence in the set drops when the uncertainties were chosen by one group (risk of bias) or when drivers are not tied to published outlooks (indirectness). |
Related techniques
- should follow DM-09 PESTLE (political, economic, social, technological, legal, environmental; the shorter PEST omits legal and environmental; outside-in thinking): PESTLE lists the external drivers to rank by impact and uncertainty
- should follow PJ-23 Horizon scanning (environmental scanning): scanned signals show which uncertainties matter
- pairs with PJ-19 Policy stress-testing: stress-testing runs a plan through the scenarios
Evidence and tag basis
Tested. A review of effectiveness research concludes that the evidence supports benefits to thinking, judgement and learning, but subjective and objective measures sometimes conflict and some studies find no or negative effects. Critics call the method not rigorously tested. (Gokmen and McKiernan (2021), scenario planning effectiveness review; Wikipedia, Scenario planning)
Tag basis: input profile inference; selection inference; sequencing inference; robustness inference. All tag values are inference unless a source is named.