AO-01 Stakeholder analysis (stakeholder mapping)
Identifies who is affected by or can affect a topic and classifies each by interest, influence and attitude, producing a stakeholder register and grid.
What it does
Identifies who is affected by or can affect a topic and classifies them by interest, influence and attitude. Artefact: a stakeholder register and grid; read who may block or support and who is negative.
When to use it
Use when a user asks who will support or block a proposal, or who needs to be consulted.
When it does not fit
The list is longer than can be mapped or acted on.
Result format
The result is a stakeholder register with one row per stakeholder, giving their interest, influence and attitude, and a grid that places each stakeholder by those classifications. It names the stakeholders who may block, those who may support and those who are negative.
Requirements on the material
| Property | Requirement type | Requirement |
|---|---|---|
| Content type | Always applies | requires=text |
| Unit of analysis | Always applies | requires=topic |
| Appraises source credibility | Applies in some cases | no |
Not restricted on: Structure, Variable types, Time structure, How the sample was chosen, Level of detail available, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.
| Minimum material | A list of potential actors with evidence on their interests and influence; published statements and submissions are enough on the desktop, with judgemental ratings. |
|---|---|
| Additional sources needed | none |
| Not for (rules) | none |
| Not for (text) | Wrong choice when the list of potential actors is longer than can be mapped or acted on. |
Choosing and ordering
| Kind of technique | Primary technique, runs in step 5.3 |
|---|---|
| Phase tag | analyse |
| Other phase tags | frame; report |
| Kind of finding | risk; pattern |
| Question answered | who; what |
| Strongest statement it supports | describe |
| Needs as input |
|
| Makes as output |
|
| Must exist first | None |
| Loop target | return to frame |
Library checks by stakes
Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: judgement dependent.
| Stakes | Check | Person involved | Counts as a different method |
|---|---|---|---|
| exploratory | assumption and limitation statement | none | no |
| decision-informing | assumption and limitation statement | none | no |
| decision-informing | source-span citation | none | no |
| decision-informing | human review sample | needed; left out below high stakes | no |
| high-stakes | assumption and limitation statement | none | no |
| high-stakes | source-span citation | none | no |
| high-stakes | human review sample | needed | no |
| high-stakes | independent review | needed | no |
| high-stakes | expert review | needed | no |
Failure modes and limits
| Model suitability | human judgement required |
|---|---|
| Typical model failure | Lists every possible party without limiting the list, and rates interest and influence from role titles instead of evidence. |
| Error sources | input data; source selection; coder or rater judgement |
| Certainty limits | Certainty drops when ratings rest on judgement without published evidence (risk of bias), when positions have changed since the evidence was written (indirectness), and when internal actors are not visible. |
Related techniques
- pairs with DM-21 Social network analysis (sociogram, network analysis) Also serves: Assess actors, options and risks.: network measures find influence through ties that role-based ratings miss
- should follow FQ-02 Decision-first framing (decision-focused or value-focused question design): a decision-first frame limits the list to actors who can change the decision
Evidence and tag basis
Documented. The page cites Eden and Ackermann (2013) that the potential list often exceeds the available time. (Wikipedia, Stakeholder analysis)
Tag basis: input profile inference; selection inference; sequencing inference; robustness inference. All tag values are inference unless a source is named.