AO-02 Power-interest grid (influence-interest grid, power-impact grid)

Plots actors on power and interest to choose an engagement strategy for each, producing a two by two grid.

Assess actors, options and risksEvidence: DocumentedPrimary technique, runs in step 5.3Strongest statement: describe

What it does

Plots stakeholders on power and interest to choose an engagement strategy for each. Artefact: a two by two grid; read who needs close engagement and who needs monitoring.

When to use it

Use when a user has a list of actors and asks which need close engagement and which only monitoring.

When it does not fit

Stakeholder positions change quickly, so a single plot goes out of date.

Result format

The result is a two by two grid with power on one axis and interest on the other, with each stakeholder placed in a quadrant. It names the stakeholders who need close engagement and those who need monitoring, with the engagement strategy for each quadrant.

Requirements on the material

PropertyRequirement typeRequirement
Content typeAlways appliesrequires=text
Unit of analysisAlways appliesrequires=topic
Appraises source credibilityApplies in some casesno

Not restricted on: Structure, Variable types, Time structure, How the sample was chosen, Level of detail available, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.

Minimum materialA judgement of each actor power and interest, with the evidence for each.
Additional sources needednone
Not for (rules)none
Not for (text)Wrong choice when actor positions change quickly, because a single plot goes out of date. Placement is judgemental.

Choosing and ordering

Kind of techniquePrimary technique, runs in step 5.3
Phase taganalyse
Other phase tagsreport
Kind of findingpattern; risk
Question answeredwho
Strongest statement it supportsdescribe
Needs as input
Makes as output
Must exist firstNone
Loop targetproceed with limit stated

Library checks by stakes

Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: judgement dependent.

StakesCheckPerson involvedCounts as a different method
exploratoryassumption and limitation statementnoneno
decision-informingassumption and limitation statementnoneno
decision-informingsource-span citationnoneno
decision-informinghuman review sampleneeded; left out below high stakesno
high-stakesassumption and limitation statementnoneno
high-stakessource-span citationnoneno
high-stakeshuman review sampleneededno
high-stakesindependent reviewneededno
high-stakesexpert reviewneededno

Failure modes and limits

Model suitabilityhuman judgement required
Typical model failurePlaces actors in quadrants with false precision from titles alone and presents the grid as fact.
Error sourcesinput data; coder or rater judgement
Certainty limitsCertainty drops because placement is judgemental (risk of bias) and because the grid is dated as soon as positions change (indirectness).

Evidence and tag basis

Documented. Attributed to Mendelow (1991), whose reference is missing from the page; placement is judgemental, and the usual quadrant labels were not seen in a fetched source. (Wikipedia, Stakeholder analysis)

Tag basis: input profile inference; selection inference; sequencing inference; robustness inference. All tag values are inference unless a source is named.